Skip to main content

Change fail rate

Target operating model — recommended contracts, not installed collection. All owner and cadence entries below are proposals to confirm before the pilot, not assigned responsibilities or approved schedules.

Prototype calculation — no live telemetry. The synthetic example calculates this metric; it has no network collectors.

Production deployment effects requiring unplanned remediation, rollback or hotfix, not solely outage declarations.

ContractDefinition
NumeratorDistinct matured production deployment_ids linked to qualifying immediate intervention
DenominatorAll distinct production deployment_ids that reached production in the matured deployment cohort
ExpressionN / D * 100
Aggregationpercent
Unit%
Eligible populationDeployments with production effect during window and approved intervention follow-up horizon elapsed.
ExclusionsFailed preproduction attempts, duplicate callbacks and no-effect retries; failures after production effect stay included.
Events and sourcedeployment.completed; deployment.failed; incident.linked; release and incident records
Owner / cadenceQuality Engineering / Weekly; finalized after horizon
Missing evidenceKnown failures / all eligible deployments is a lower bound where incident linkage incomplete; label provisional and report unknown links.
Gaming and limitsAvoid incident links or relabel intervention planned; reconcile rollbacks/hotfixes independently. Descriptive signal, not causal AI productivity attribution. Source completeness, task mix and sampling limit inference; report uncertainty. Define immediate intervention and follow-up horizon before pilot; no universal incident-to-AI attribution.

Read the shared collection and safeguards before collecting data; see the synthetic example and limits.

Return to Skills Measurement.