AEROSIM-TS-130

Project task

Publish accurate release notes and operational plan

Release notes and the operational plan reconcile all 144 cumulative Release 1.0.0 Tasks—the original 130 allocations plus 14 Wave 31 corrections—and define executable readiness, migration, compatibility, rollback, capacity, risk, ownership, and acceptance gates.

AEROSIM-TS-130Canonical ID TASK-0130
Verified flow state
Done
Owner
AeroSim Releases
Component
Release management — release notes and operational plan
Repository
corp-v1-aerosim/corp-v1-aerosim-documentation

Delivery scope

Reconcile the immutable candidate against the complete 144-Task inventory, preserving the original 130-Task allocation and separately reporting the 14 Wave 31 corrections; publish changelog and readiness evidence, migration and compatibility decisions, rollback and previous-known-good identity, capacity and operational risk, named owners, and objective acceptance criteria.

Implementation contract

Implementation artifacts

  • corp-v1-aerosim/corp-v1-aerosim-documentation:ways-of-working/release-readiness.md
  • corp-v1-aerosim/corp-v1-aerosim-documentation:data/tasks/TASK-0130.yml

Inputs

  • TASK-0129 immutable candidate evidence, treated as an operational prerequisite rather than a graph dependency.
  • Canonical Release 1.0.0 Task inventory and exact lifecycle states.
  • Changelog, migration, compatibility, rollback, capacity, risk, owner, and acceptance inputs from the governed repositories and runtime plan.

Outputs

  • Accurate Release 1.0.0 notes covering 144 cumulative Tasks, the original 130 allocations, the 14 Wave 31 corrections, and the current 143 ToBeReleased plus one ReadyForDelivery state.
  • An operational plan with go/no-go gates, owners, rollback triggers, and acceptance criteria.

Failure boundaries

  • Stop publication when Task counts, lifecycle states, candidate references, migration or compatibility statements, owners, or acceptance criteria cannot be reconciled.
  • Label unknown or unverified operational evidence as a blocker; never convert it into a positive readiness claim.
  • Do not treat release notes as approval to merge GitOps or deploy.

Excluded scope

  • Do not modify application or GitOps repositories and do not deploy.

Verification steps

  • Derive and assert 144 total Release 1.0.0 Tasks with 143 ToBeReleased, one ReadyForDelivery, zero InProgress, and zero Done.
  • Cross-check every release-note claim to immutable repository, artifact, decision, or runtime-plan evidence.
  • Review migration, compatibility, rollback, capacity, risk, ownership, and acceptance sections for explicit go/no-go behavior.

Traceability

Requirements

Dependencies

None

UI/UX applicability

verification

Acceptance evidence

Verified delivery: Release 1.0.0.0 operational plan reconciled 144 cumulative Tasks: 140 implementation/acceptance corrections were ToBeReleased before release-verification execution; TASK-0129 through TASK-0132 remained release-verification work. The plan binds immutable candidate identity, no schema migration, current PostgreSQL compatibility, rollback to GitOps revision f3a5fe996ffa551c036211e8e64a3f5de5b534c3, capacity/risk checks, Argo/workload/route/login/flight acceptance, and release ownership. Release completion verified on product 1.0.0.0 at GitOps revision 5d3712d89dfbf7dacd993348e55f497d126c7bf9 with Argo Synced/Healthy, exact image digests, authenticated API/database access, and three-world configured-flight acceptance.

Current evidence boundary

No current implementation, acceptance, release, or deployment evidence is claimed for this planned Task. Any prior implementation may be used only as prototype and discovery evidence.